| 1.0-α4 | April 01 2009 | 6 closed tickets |
| 1.0-α3 | November 21 2008 | 1 closed ticket |
| 1.0-α2 | July 06 2008 | 6 closed tickets |
Lighthouse has a new layout. Prefer the old one? Return to the old layout, and switch back any time from the link at the top of each page.
| Completed Milestones | When it was due | Report |
|---|---|---|
| 1.0-α4 | April 01 2009 | 6 closed tickets |
| 1.0-α3 | November 21 2008 | 1 closed ticket |